Use this region to specify the required method of positional annotation. Schematic Annotation Configuration Order of Processing Proposed Change List - this region lists the proposed changes that will occur once accepted and executed using an Engineering Change Order (ECO).Schematic Annotation Configuration - this region is for configuring the annotation scheme, as well as the scope of annotation.The dialog is partitioned into two primary regions: The dialog is accessed from the Schematic Editor by using the Tools | Annotation | ยป Annotate Schematics command from the main menus. Annotation options can be configured to package multi-part components, set Index and Suffix options, and Reset Schematic Designators (including any duplicate designators). The Annotate dialog provides controls to systematically assign designators to all (or selected parts) in selected schematic sheets of a project, and ensures that designators are unique and ordered based on their position.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |